Name each interface
Draw the stack as the customer receives it. Give the contact surface and the internal bond a separate name, then add arrows showing which liners are removed at assembly and at use. A supplier drawing may describe a side by unwind direction. Translate that term onto the finished product drawing.
Separate the two failure locations
If the central component comes away with the liner, photograph both exposed surfaces before pressing anything back together. If the entire assembled patch comes off during handling, record that event separately. Two events can leave similar-looking loose components in the tray while pointing to different interfaces.
Order left and right views
An annotated front and reverse photograph lets the converter confirm orientation before quoting. Ask for a cross-section when a face disappears inside the finished part. Keep the layer sequence and matching supplier grade with the approved sample so a second buyer can reconstruct the assembly without dismantling it.
Frequently asked questions
Can both adhesive faces share one requirement?
They can share a requirement when their substrates and jobs justify it. List each interface individually so the supplier can confirm the construction and evidence that apply to both.