Set a clear trigger for review
Make changes to carrier, adhesive, liner, coating face or converting method visible before they reach the order. Define which changes require new samples and which use existing approved equivalents.
Leave space for the supplier to describe a proposed replacement and its reason. The description should include a part revision and effective lot where available.
Review the likely affected checks
A liner coating change calls for an opening review, while a carrier change can affect edge movement and optical finish. Use the affected interface to select meaningful comparison checks.
Compare a representative changed sample with a retained approved sample. Note any impact on instructions, quality documents and retailer artwork before raising a replacement purchase order.
Record when the change goes into effect
Put the accepted date and effective lot into the purchasing and quality records. Old and new stock should remain distinguishable during transition.
If an issue arises after release, the revision history should show which packs used the changed material. That gives the buyer a practical starting point for reviewing returned or retained samples.
- Original and proposed grades
- Retained approved sample and review result
- Effective lot and new approval revision
Frequently asked questions
When should a supplier notify me about a change?
Agree the notification point in the approved supply arrangement. Newly proposed materials should be visible before they replace the specified grade.